SIGN IN

Register

Already registered? Sign in

2010-354 THE DEVELOPMENT OPPORTUNITIES OF NAVIGATION BETWEEN BUCHAREST, THE DANUBE AND THE BLACK SEAViorica Manole 1, Oana Gabriela Mircea 11 University of Bucharest, The Geography Faculty, Romania Abstract:The Danube – Bucharest Channel, which is still only a project, was planned to facilitate the navigation between Bucharest, the capital of Romania, and the Black Sea. The […]

Read More

Thierry Woignier 1, Marc Morell 2, Olivija Morell 3, Laurent Duffours 4 1 UR Seqbio IRD-PRAM, Le Lamentin, Martinique ,France 2 IRD Caraïbes, Fort-de-France,  Martinique, France 3 Meteo Mak, Skopje, Macedonia 4. Prime Verre, avenue A. Einstein , Montpellier, France Abstract : The scientific and economic context of this study is related to the pollution […]

Read More

2010-766 PRELIMINARY RESULTS ON WFD BASED MONITORING SYSTEM INSTALLED IN THE PRESPA LAKE WATERSHED AND FOCUSED ON CYANOBACTERIAZdraveski Nikola 1, Lesoski Jovica 1, Krstic Svetislav 1Institute of Biology, Faculty of Natural Sciences and Mathematics, “St.Ciril and Methodius” University, Skopje, Macedonia Abstract: In the course of the project “Development Prespa Lake Watershed Management Plan” a full […]

Read More

2010-075 INFLUENCE OF VERTICAL  VIBRATION OF SUPPORT ON THE  DYNAMIC STABILITY OF SUBSEA PIPELINEN. Mestanzade 1, L. Yilmaz 2 1 Atakoy Campus, Istanbul Kultur University, Istanbul,Turkey2 Technical University of Istanbul, Civil Engineering Faculty, Hydraulic Division, Istanbul, Turkey Abstract:The underwater suspended pipeline was investigated for the dynamic instability which is applied at the problem for the […]

Read More

2010-254 THE STAGE OF THE PHYSICAL, CHEMICAL, BIOLOGICAL AND MICROBIOLOGICAL EQUILIBRIUM AFTER THE CONSERVATION PERIOD OF LAKE NEGRU, SOVATA, ROMANIA Gheorghievici Gheorghe 1, Ana Munteanu 1, Iulia Pompei 1, Iosif Tanase 11 National Institute of Rehabilitation, Physical Medicine and Balneoclimatology, Romania Abstract:The study presents the reevaluation  of the physical, chemical, biological and microbiological parameters of […]

Read More

2010-253 WEISS, A WATER EMISSION INVENTORY PLANNING SUPPORT SYSTEM AIMED AT REDUCING THE POLLUTION OF WATER BODIESLeen Van Esch 1, Greet Vos 2, Guy Engelen 11 VITO, Geel, Belgium2 VMM, Belgium Abstract: The European Water Framework Directive (2000/60/EC) commits the EU Member States to achieve and maintain a clean and well-managed water environment by 2015. […]

Read More

2010-252 BIOSORPTION OF COPPER(II) FROM AQUEOUS SOLUTIONS BY PLEUROTUS CORNUCOPIAEUmmuhan Danis 11 Ondokuz may Uni Engineering Faculty, Department of Chemical Engineering, Samsun, Turkey Abstract:The biosorption of Cu(II) from aqueous solutions by Pleurotus cornucopiae was investigated as a function of initial pH, contact time, initial metal ion concentration and biosorbent concentration. The aim of this study […]

Read More

2010-251 CREATION OF FLOOD HAZARD MAPSSnezhanka Balabanova 11 National Institute of Meteorology and Hydrology, Sofia, Bulgaria Abstract:Flood events are a part of nature. They have existed and will continue to exist. Society has become more vulnerable to natural hazards. Although floods are natural phenomena, human activities and human interventions such as urbanization, agricultural practices and […]

Read More

2010-250 MITIGATION MEASURES AND EXTRACTION OF FLOATING DEBRIS FROM HYDROELECTRIC POWER PLANT RESERVOIR ZVORNIKDanica Zupanski 1, Mileta Milojevic 11 Institute Jaroslav Cerni for the Development of Water Resources, Belgrade, Serbia Abstract: Many non-sanitary waste disposal plants are located in floodplain areas. During flooding events municipal waste is forced into the river system and transported away […]

Read More

2010-305 AN OUTLINE OF WISKI 7 AND HBV SYSTEMS implemented at the Hydromet Service oF SERBIA Mihailo Andjelic 1, Elin Langsholt 2, Matthias Egeling 3, Slavimir Stevanovic 1, Nena Kovacevic 11 Hydrometeorological Service of Serbia, Belgrade, Serbia2 Norwegian Water Resources and Energy Directorate(NVE), Norway3 Kisters A. G., Germany Abstract:A project is being implemented in 2009 […]

Read More